​My  extensive  work  experience  includes  actual  training  in  engineering  construction  projects specializing in M.E.P. works for Kahramaa - Qatar Substation Projects. These exposures help me to obtain my ability to lead in estimating, planning, technical, an d costing works in this field. Supervision of Electrical works using MICC Cables , interfacing with Fire Alarm Systems and Motorized Dampers for HVAC worksUsage of latest Building Industrial  Materials, Theoretical and Practical Knowledge in  Estimation, Execution of Engineering Projects, exposure to Engineering Codes and  Practices.  Knowledge in Microsoft Word, Excel, Microsoft Outlook, Power Point & CADD.

Work experience
 

Job Description:
a.   Assigned in Site Supervision and Coordination with Clients.
b.   Evaluation of Equipment Specification, Drawings, Bill of Quantities of various equipments like Distribution Panels, Lighting Fixtures, etc.
c.  Inspect site conditions, monitor all construction activities related to the Electrical works and photograph and document the works in progress on a daily basis
d.  Review and note all materials delivered to the site and verify compliance with the approved samples, materials and construction documents.
e. Check that all materials, equipment and electrical related items are properly stored on site
and report any compliance issues.
f.  Inspect the installation of all Electrical related temporary and permanent works to ensure compliance with the contract documents, approved shop drawings and submittals.
g.   Prepare daily logs, reports and photographs. Maintain records of all inspections made, tests
performed, work executed etc. Perform all work in accordance with the contract documents and company procedures.
h.   Observe site safety practices and the progress of work. Report any concerns to the Superior.
i.  Assists with the inspection of the completed works, help prepare punch lists. Monitor start up, testing commissioning and handover of the works
j. Perform any duties assigned by the Project Manager.
k.   Assist the Electrical Engineer in RFI review and provide recommendations

AlArrab Contracting Co. Ltd. (M.E.P. – Substation Division)

Qatar Power Transmission System Expansion Phase- VIII, IX, & X
KAHRAMAA- Areva T&D, Siemens, Hyosung Substation Projects Doha, State of Qatar



M.E.P Engineer -- November 2008- present

AlArrab Contracting Co.Ltd.  - ACC is a general contracting company with activities in Saudi Arabia and other GCC. ACC can partner with power, water, petrochemical and other international contractors to perform large infrastructure projects.

Languages

Proficient in English & Filipino  (written& oral)

Arabic & HIndi (oral communications)

 

Skills

MS OFFICE

CAD​

Analytic and Critical thinking

Planner

Public Relation

Goal Seeker

Time Management

 

2010 - present

2010 - present

AlArrab Trading & Contracting Co. (SEMECO)
Porto Arabia –The Pearl Qatar Projects Tower 9B, 10B, 9A
Doha, State of Qatar

ELECTRICAL ENGINEER –  August 2008 to November 2008

a. Assigned in the Technical office department. Experience in Tendering, Procurement,
Execution, Planning, Quantity survey in construction engineering.

b.   Evaluation of Equipment Specification, Drawings, Bill of Quantities of various equipments like
Distribution Panels,  Lighting Fixtures, etc.
c. Participation in planning, designing and executing electrical system, selection of electrical lighting fixtures, and supervision of project related to electrical works
d.   Participation in organizing and allocating manpower in their designated work. Supervising and
monitoring the manpower work at site.
e. Preparation of as-built drawings, schedules and other electrical matter.
f. Preparation of Material Submittals and recommendations for Material Inspection.
g.   Preparation of Material Technical Specifications as per approved by KAHRAMAA-Qatar, Quantity takes off for Tendering and Procurement the material.
h.   Attending all the Technical queries and Change orders and follow up for getting the approval.

i. Responsible in making reports of accomplishment and submitted to the Project Manager.
j. Prepare work schedule for the foreman and electricians under my supervision.

k.    Prepare monthly accomplishment and technical report for the Project Engineer.

l. Coordination with the senior electrical foreman and other Engineers on site.
m.  Attend regular technical and coordination meetings with the Project Engineer.

Calamba New Bottlers Corporation, Calamba City, Laguna Philippines

Calamba New Bottlers Corporation a bottling company under the license of Pepsi Cola ensuring its quality, production quantity and safety.

(2 years) Junior Electrical Engineer (Production Dept.) – March 2006 to March 2008

Bachelor of Science in Electrical Engineering

(GPA: Very Good 86%) from

Bicol University College of Engineering (Legazpi City, Philippines)

Bicol University, College of Engineering

2000 - 2005

Education
 


a.   Responsible for the electrical installation of lighting fixtures, panel boards, power outlet, raceways, cable ducting, power cables, cable trays, cable ladders, etc.
b.   Responsible for installation of Power Cable, laying and termination, Control and instrumentation cable laying and termination.
c. Supervised building technician in the preventive maintenance of building and facilities and other works for the improvement of the building.
d.   Responsible in troubleshooting of electrical trouble occurs in the plant so that it will not hamper its operation.
e. Responsible in listing needed materials in the assigned production area in which electrical is involved.
f. Responsible in making reports of accomplishment and submitted to my superior.

g.    Prepare work schedule for the technicians under my supervision.
h.   Prepare monthly accomplishment and technical report for the Management.

i. Coordination with the senior electrical foreman and other plant engineers.
j. Involved in checking trouble shoot or evaluate electrical coolers prior to repair.

k.    Attend regular technical and coordination meetings with the plant engineers.